Waste factors impacting on delivery cost performance of design and build low-cost housing projects in Nigeria.

Lovelin Obi, Mohammed Arif, Bankole Osita Awuzie

    Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

    Abstract

    The Design and Build (DB) procurement strategy has been described, severally, as the strategy of choice in the delivery of Low Cost Housing (LcH) projects in Nigeria, occasioned by its reputation for enhanced cost reduction. However, the inability by the client organisations and developers alike to deliver affordable LcH in Nigeria has attracted renewed scrutiny into the efficacy of this procurement strategy. Surprisingly, such scrutiny has failed to examine the various waste factors which may be responsible for the high delivery costs experienced on such projects. Therefore, it has become imperative that such waste factors be identified. Extant literature has highlighted the relationship between waste factors and delivery cost within the realm of building projects generally but with little emphasis on Design and Build Low-cost Housing (DBLcH) projects particularly in Nigeria. It is the purpose of this study to identify the waste factors significantly impacting on the delivery cost performance of DBLcH Projects. Adopting an exploratory sequential mixed method design, an extensive review of literature was conducted and employing content analysis, 50 waste factors across various construction projects were identified. The factors were classified according to the stages where they originate, namely; design, pre-construction and construction and presented to DBLcH projects experts for validation through questionnaires. The emerging data was analysed using appropriate statistical analytical techniques. Findings revealed that waste factors originating from the design stage possessed the most significant impact upon delivery costs performance of DBLcH projects. It is hoped that the waste factors identified through this study provides a platform that would engender the development of appropriate contemporary approaches towards effective cost management within the context of DBLcH project delivery in Nigeria.
    Original languageEnglish
    Title of host publicationThe International Post-graduate Research Conference 2015, University of Salford
    EditorsVian Ahmed, Udayangani Kulatunga, Chaminda Pathriage, Zeesham Aziz, Jason Underwood, E. Hayat, M Thayaparan
    Place of PublicationSalford
    PublisherUniversity of Salford
    Pages561-573
    Number of pages13
    ISBN (Print)9781907842726
    Publication statusPublished - 10 Jun 2015

    Keywords

    • Cost performance, Design and Build, Low-cost housing Delivery project, waste factor

    Fingerprint

    Dive into the research topics of 'Waste factors impacting on delivery cost performance of design and build low-cost housing projects in Nigeria.'. Together they form a unique fingerprint.

    Cite this